Power station boiler-flue gas
Submit
Power plant boiler flue gas treatment route 1

Multi pollutant collaborative integrated treatment process:
SNCR+SCR+ESP+WFGD+WESP
Technical features:
| A Mature technological roadmap | B Collaborative removal of multiple pollutants | C High operational stability |
| D High degree of system automation | E Waste water recycling | F Achieve the 50/35/5 ultra-low emission target |
Power plant boiler flue gas treatment route 2

Multi pollutant collaborative integrated treatment process:
SNCR+SCR+FF+WFGD+WESP
Technical features:
| A Mature technological roadmap | B Collaborative removal of multiple pollutants | C High operational stability |
| D High degree of system automation | E Waste water recycling | F Achieve the 50/35/5 ultra-low emission target |